What it costs in government fees to build a home in Douglas County, Colorado

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Douglas County — itemized, sourced, and dated.

10 fees verified 18 source documents Compiled Jul 31, 2026

Your project

Total government fees $55,528 Single-family detached, 2,000 sq ft finished, 4BR, on a platted lot in the unincorporated county — water and sewer from whichever special district serves the parcel. Ranges from $55,528 (Dominion district, lot 5,000 sq ft or larger) to $67,602 (Roxborough Water & Sanitation District).
What this specific number is. Dominion Water & Sanitation District (Sterling Ranch), the main greenfield single-family area in unincorporated Douglas County. It is one point inside a 1.2× range — $55,528 to $67,602 for the identical house on different lots in the same county. In Colorado the question "what does it cost here" has no single answer until you name the parcel and its service district, so read the range as the real answer and the headline as one worked example.
Check the utility provider before you rely on thisDouglas County has roughly 28 separate water providers and no county utility. Tap fees are 89-91% of the entire stack and vary by $12,000 between districts. Only about three of the 28 publish an actual number. The district determines the answer — the county barely matters.
Water & sewer — Dominion Water & Sanitation District
FeeAmount
Water Infrastructure Fee Eff. Dec 19, 2025 · source Dominion Water & Sanitation District, Attachment A-1. Single-family, lot 5,000 sq ft or larger. $25,200.00
Water Resource Fee Eff. Dec 19, 2025 · source Drops to $9,870 on lots under 5,000 sq ft. $12,960.00
Sewer Tap Eff. Dec 19, 2025 · source ⚠ These are WHOLESALE fees charged to the Sterling Ranch district authority. The retail amount a builder pays may carry a markup that is not published. $11,310.00
Subtotal$49,470
Building permits, surcharges & other
FeeAmount
Building Permit Fee (Table 10.3) Eff. Jul 1, 2026 · sec 10.3 · source $993.75 + $5.60 per $1,000 increment over $100k. Valuation from ICC Building Valuation Data with a modifier of 1: 2,000 sf x $175.92 = $351,840. Covers ALL building, electrical, mechanical and plumbing work — Colorado counties vary on this. $2,404.95
Use Tax on construction and building materials Eff. Jul 1, 2026 · sec 10.3.10 · source ⚠ 1% of 50% of valuation. This has no Florida equivalent and is easy to miss entirely — the code section states only that a use tax 'shall be collected' with no rate. The rate comes from the Colorado Department of Revenue schedule. $1,759.20
Plan review fee Eff. Jul 1, 2026 · sec 10.3.1 · source 65% of the permit fee, or 10% if using a stock plan. $1,563.22
Drainage, Erosion & Sediment Control permit Eff. Jul 1, 2026 · sec 10.3.5 · source $146.00
DESC plan review Eff. Jul 1, 2026 · sec 10.3.5.1 · source $94.90
Zoning fee, one and two family Eff. Jul 1, 2026 · sec 10.3.6.1 · source $50.00
Driveway permit Eff. Jul 1, 2026 · sec 10.3.4 · source Rural, no curb, gutter or sidewalk. $40.00
Subtotal$6,058

Water and sanitation district

Each district has its own board and its own tap fees. These are the three that publish current schedules.

DistrictFee
Dominion W&SD (Sterling Ranch)$49,470
Parker Water & Sanitation District$50,762
Roxborough Water & Sanitation District$61,544

Fees Douglas County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

This page models one house. 2,000 sq ft, single-family detached, Dominion W&SD (Sterling Ranch). If you're underwriting an actual project — a unit mix, a different district, a CO date that might slip past a scheduled increase — we compute that stack for you.
Need a county we haven't published? That's the main thing we do.
from $290 What we compile, and what it costs →
How to use this. Every figure is transcribed from an official Douglas County, service-district or Colorado Revised Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Water and sewer is 89% of this stack. Built for screening and pro-forma work; confirm with the county and the district before you sign anything.