What it costs in government fees to build a home in Larimer County, Colorado

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Larimer County — itemized, sourced, and dated.

18 fees verified 22 source documents Compiled Jul 31, 2026

Your project

Total government fees $85,905 Single-family detached, 2,000 sq ft finished, 4BR, on a platted lot in the unincorporated county — water and sewer from whichever special district serves the parcel. Ranges from $20,662 (private well and septic, outside any growth management area, Thompson schools) to $130,763 (Fort Collins-Loveland Water District plus South Fort Collins Sanitation District sewer).
What this specific number is. East Larimer County Water District tap on a ~10,000 sq ft lot plus septic, inside the Fort Collins growth management area, Poudre schools. It is one point inside a 6.3× range — $20,662 to $130,763 for the identical house on different lots in the same county. In Colorado the question "what does it cost here" has no single answer until you name the parcel and its service district, so read the range as the real answer and the headline as one worked example.
Check the utility provider before you rely on thisLarimer County operates no water or sewer utility. Raw water dedication or cash-in-lieu is often three to eight times the plant investment fee and can exceed $99,000 by itself. Districts also disagree on the basis — ELCO tiers on total lot square footage, Fort Collins-Loveland on irrigable lot size. Same nominal lot, very different tier.
Impact & mobility fees
FeeAmount
Transportation Capital Expansion Fee — County Eff. Jul 1, 2025 · p.1 · source ⚠ The Regional and County columns are legitimately ADDITIVE here — charging only one understates by 92%. This is the opposite of the multi-column trap in most counties; verify direction rather than assuming. $6,389.00
School fee — Poudre School District PR-1 Eff. Jul 1, 2025 · p.2 · source Thompson RJ2 is $1,382 instead. $1,710.00
Regional Park Land Dedication / In-Lieu Fee Eff. Jul 1, 2025 · p.2 · source Applies in all unincorporated areas. $1,402.00
Community Park Land Dedication / In-Lieu Fee — Fort Collins GMA Eff. Jul 1, 2025 · p.2 · source Varies by growth management area: Loveland $590, Berthoud $668, Estes $303, and $0 outside any GMA. $669.00
Transportation Capital Expansion Fee — Regional Eff. Jul 1, 2025 · p.1 · source Tiered on finished living space; 2,000 sq ft falls in the 1,801-2,400 band. $535.00
Subtotal$10,705
Water & sewer — East Larimer County Water District (ELCO)
FeeAmount
Cash-in-lieu of raw water — ELCO, 9,000-10,999 sq ft lot Eff. Jan 1, 2026 · source ⚠ DERIVED, not published as a total. ELCO publishes acre-feet, a 0.70 AF credit factor, and a $62,000 per-unit price — you must do the arithmetic yourself. The district states these are modified periodically and must be confirmed. $54,808.00
Plant Investment Fee — ELCO Eff. Jan 1, 2026 · source $8,768.00
On-site wastewater treatment system permit plus state surcharge Eff. Jan 1, 2026 · source $1,858 county permit plus a $23 Colorado Water Quality Control Division surcharge. Sanitation-district sewer is much rarer than district water — the dominant pattern is district water plus on-site septic. $1,881.00
Meter and tapping fee — ELCO, 3/4 inch Eff. Jan 1, 2026 · source $720.00
Subtotal$66,177
Building permits, surcharges & other
FeeAmount
Building Permit Fee (Table 1-A) Eff. Jul 1, 2026 · source ⚠ Valuation is APPLICANT-DECLARED — Larimer publishes no dollars-per-square-foot table, so both the permit fee and the use tax are project-specific. Shown at a $400,000 declared valuation. Also: the county's own fees page currently reads 'Coming Soon' and links no schedule, despite a 2.29% increase taking effect July 1. $3,666.84
Building Material Use Tax Eff. Jan 1, 2026 · source ⚠ Valuation x 50% x 1.05%. The rate rose from 0.80% on January 1, 2026, so any pre-2026 source is 24% low. Collected as a DEPOSIT and reconciled within 60 days of certificate of occupancy — a builder can owe more or get money back. $2,100.00
Plan Review Fee Eff. Jul 1, 2026 · source 50% of the permit fee for one- and two-family dwellings. The 65% rate applies only to commercial and multifamily above a duplex. $1,833.42
Mechanical / heating permit Eff. Jul 1, 2026 · source Separate permit, valuation-driven. Illustrative at $18,000 of mechanical work. $475.23
Plumbing permit Eff. Jul 1, 2026 · source Separate permit, valuation-driven. Illustrative at $12,000 of plumbing work. Unlike Douglas and El Paso, Larimer does NOT bundle trades. $321.92
Electrical permit Eff. Jul 1, 2026 · source Based on enclosed living area only, 1,501-2,000 sq ft bracket. Larimer issues its own electrical permits rather than deferring to the State Electrical Board. $260.84
Zoning Compliance Review at building permit Eff. Jul 1, 2026 · source $165.11
Wildfire Site Assessment Fee — new residence Eff. Jul 1, 2026 · source Only in a designated wildfire hazard area. $150.00
Access permit — residential, 1-2 homes Eff. Jul 1, 2026 · source Required if the driveway accesses a county road. $50.00
Subtotal$9,023

Water provider

Raw water requirements dominate. The county-controlled portion is roughly $19,000 in every scenario; water swings the total by over $110,000.

DistrictFee
Private well and septic$1,981
ELCO, 9,000-10,999 sq ft lot$64,296
ELCO, over 23,000 sq ft lot$115,945
Fort Collins-Loveland WD, 9,001-10,000 sq ft irrigable$104,885

Fees Larimer County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

This page models one house. 2,000 sq ft, single-family detached, Private well and septic. If you're underwriting an actual project — a unit mix, a different district, a CO date that might slip past a scheduled increase — we compute that stack for you.
Need a county we haven't published? That's the main thing we do.
from $290 What we compile, and what it costs →
How to use this. Every figure is transcribed from an official Larimer County, service-district or Colorado Revised Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Water and sewer is 77% of this stack. Built for screening and pro-forma work; confirm with the county and the district before you sign anything.