What it costs in government fees to build a home in Seminole County, Florida

Every impact fee, water and sewer connection charge, and building permit for a new single-family detached home in unincorporated Seminole County — itemized, sourced, and dated.

22 fees verified 22 source documents Compiled Jul 31, 2026

Your project

Total government fees $22,159 Single-family detached, 2,000 sq ft heated/conditioned, 4BR, 3/4" water meter, county water and sewer, unincorporated area. Ranges from $15,952 (not on county utilities — city, private utility, or well and septic) to $26,757 (Rural mobility district).
Check the utility provider before you rely on thisUnincorporated Seminole is a utility patchwork. Seminole County Utilities, Sunshine Water Services, the Florida Governmental Utility Authority, four small associations, six cities, and an 84-square-mile area on wells and septic all serve parts of it. Entire unincorporated subdivisions in Sanford are on City of Sanford water and sewer and pay the county nothing — 28% of the total turning on the parcel's location.
Impact & mobility fees
FeeAmount
Educational System Impact Fee — Single Family Eff. Apr 9, 2018 · Ord. 2018-1 sec 105.21(b) · source $9,000.00
Mobility Fee — Single Family 1,500-2,499 sf, Suburb district Eff. Jun 29, 2021 · source ⚠ Sunsets December 31, 2030 unless re-enacted. Not collected inside the City of Altamonte Springs, which adopted its own. $2,714.00
Fire and Rescue System Impact Fee — 1,500-2,499 sf Eff. Jun 29, 2021 · source Fire and EMS are one combined fee; there is no separate EMS impact fee. $497.00
Library System Impact Fee — 1,500-2,499 sf Eff. Jun 29, 2021 · source $395.00
Subtotal$12,606
Water & sewer — Seminole County Utilities
FeeAmount
Wastewater Service Capacity Fee — per dwelling unit Eff. Sep 24, 2024 · Admin Code 20.45 Ex. A Table A.2 · source $3,175.00
Water Service Capacity Fee — per dwelling unit Eff. Sep 24, 2024 · Admin Code 20.45 Ex. A Table A.2 · source $2,574.00
Water Service Installation, 3/4" — materials and installation Eff. Sep 24, 2024 · Ex. B sec IV(G) · source ⚠ The installation table has three columns — Tap-In $370, Materials $308, Materials and Installation $353. Real permits charge only the $353. Summing columns overstates by $678. $353.00
Account deposits — water $45 + wastewater $60 Eff. Sep 24, 2024 · Ex. B sec IV(J) · source $105.00
Subtotal$6,207
Building permits, surcharges & other
FeeAmount
Building Permit — residential construction Eff. Oct 28, 2025 · Admin Code 20.10 sec L(1)(a)(i) · source $60 base plus $5.00 per $1,000 of construction value, where value comes from ICC estimates for all areas under roof. Back-computed from real permits at about $143/sq ft under roof. $1,895.00
Plumbing Permit — single family new construction Eff. Oct 28, 2025 · sec L(3)(a) · source Trade permits are NOT bundled in Seminole — they appear as separate line items on every permit examined. $190.00
Electrical Permit — single family new construction, includes T-pole Eff. Oct 28, 2025 · sec L(4)(a) · source $180.00
Mechanical Permit — single family new construction Eff. Oct 28, 2025 · sec L(2)(a) · source $105.00
Residential solid waste — first-year assessment billed on the permit Eff. Jan 1, 2026 · source Collection Option 1. Observed flat at $305 across permits from eight different months — it is not prorated. $305.00
Construction Plan Review Eff. Oct 28, 2025 · sec L(7)(a) · source $200.00
Prepower agreement Eff. Oct 28, 2025 · sec L(6)(r) · source $100.00
Irrigation sub-permit Eff. Oct 28, 2025 · sec L(3)(b) · source $81.00
Application / Technology Submittals Fee Eff. Oct 28, 2025 · sec L(6)(dd) · source $75.00
Low-voltage electrical sub-permit Eff. Oct 28, 2025 · sec L(4)(b) · source $69.00
Roof permit issued with the building permit Eff. Oct 28, 2025 · sec L(1)(p) · source $60.00
Certification surcharge, F.S. 468.631 (1.5%) Eff. Invalid Date · source ⚠ Appears on no county fee schedule. Visible only as fee codes on real permit ledgers. $38.70
Dept Community Affairs surcharge, F.S. 553.721 (1.0%) Eff. Invalid Date · source $25.80
Zoning permit processing Eff. Oct 28, 2025 · sec L(6)(gg) · source $20.00
Subtotal$3,346

Mobility fee district

Three rate columns. Rural is 2.7x Suburb — reading the wrong column overstates by $4,598, or 21% of the entire stack. 'Suburb (West)' and 'Suburb (East)' both bill from the single Suburb column; the split exists only for trust-fund accounting.

DistrictFee
Core$1,811
Suburb$2,714
Rural$7,312

Fees Seminole County does not charge

Verified absent, so you don't go looking for them.

What we could not verify These are reported as gaps rather than estimated. The total above is a floor.

Why this number is easy to get wrong

This page models one house. 2,000 sq ft, single-family detached, 3/4" meter, Core. If you're underwriting an actual project — a unit mix, a different district, a CO date that might slip past a scheduled increase — we compute that stack for you.
Need a county we haven't published? That's the main thing we do.
from $290 What we compile, and what it costs →
How to use this. Every figure is transcribed from an official Seminole County or Florida Statutes document, linked inline, with its effective date. No third-party legal-code mirrors were used — in testing, one returned impact fees off by 2.4×. Built for screening and pro-forma work; confirm with the county before you sign anything.

← Compare all Florida counties